2014: The movie

My apologies to all  for the terrible blogging this last little while. To be honest, we were too busy having fun in our almost-finished/always-in-progress cabin. To try and play catch-up I put all of our pictures in one slideshow to summarize what was another amazing and productive year.

Whirlwind weekend of work and sunshine!

There was also good food and swimming but I forgot to take pictures of those! Many many thanks to Nessa, John Sean and Bill for their hard work!

Supermoon weekend (July 11)

The weekend of the super moon we went up with Maddy, Suzanne and Kristen and Tomo the incredible expanding puppy. In between gazing at the super moon, drinking Kristen’s yummy cocktails and swimming we got a heck of a lot of work done. 

Tiling! Ikea cabinets assembled! Electrical! Plumbing!
 Thank you ladies for a super weekend!


This slideshow requires JavaScript.

,

Cabin building update

Hi all,

Just wanted to update you on our progress. We are trying to get as much done as possible before August 30th when we will have a party to celebrate the cabin completion and our 15th anniversary.
So we have 8 weekends to get the cabin completed – or as close as we can. If you are interested in helping we will be going over every weekend and it is quite a delightful time of year to spend there with swimming, disk golf, gardening and of course cabin building.
Projects left to complete:
-Electrical: rough in wire, panel and boxes. Cable to power tower. install outlets and switches.
-Flooring: purchase, ship and install flooring throughout the house.
-Deck-rail: design, purchase and install deck railing
-Tiling: upper bathroom
-Plumbing: install upstairs sink and toilet
-Kitchen: design, purchase and install cabinets and counter-tops
Let us know if you would like to join us.
Kevin + Sonja